Brivo OEC 715/785/865 Mobile C-Arm X-ray Product Service Manual
8-4
8.2.
PM Checklist
Brivo OEC 715/785/865 PM Checklist
Administrative Information
Medical Facility Information
Field Service Engineer Information
Hospital or Clinic Name:
FSE name:
Address:
City:
Employee SSO:
State:
Country:
Postal Code/Zip:
Contact Person:
Installation Date:
Contact Phone:
Department:
System Configuration
Workstation Software Version and Build#:
MCB Software Version and Build#:
Serial Number:
System ID:
Safety Inspection
Antistatic Drag-wires
Footswitch cable and pins
Electrical Plug and power cord
Ground Continuity
Interconnect Cable and Connector
PC Maintenance
PC Clean
Yes No
Replace Cell Battery (If needed)
Yes No
System Function Checks
Power On Checks
Pass Fail
C-Arm Checks
Workstation Checks
Mechanical Movement:
Key Switch:
C-Arm Controls:
Emergency Switch:
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Mechanical Movement :
Workstation Operation:
UPS Battery Performance Check:
System Status Backup:
Pass Fail
Pass Fail
Pass Fail
Yes No
X-ray Generator Accuracy Tests
KV Accuracy (
±
7%)
Low Dose:
Normal Fluoro:
HLF:
[email protected](Actual 6.0): ,
110kV[email protected](Actual 4.5): ,(Dose Group: Normal 50 and HLF 50)
110kV[email protected](Actual 6.0): , (Dose Group: Normal 50 and HLF 100)/(Dose Group: Normal 88 and HLF
100)
Digital spot:
[email protected]: , [email protected]: , [email protected]:
Radiography:
55 kVp@40mAs : , 80 kVp@40mAs: , 110 kVp@20mAs:
Summary of Contents for Brivo OEC 715
Page 2: ......
Page 19: ...Chapter1 Introduction and Safety...
Page 41: ...Introduction and Safety 23 46 54 20 18 26...
Page 55: ...Chapter2 System Overview...
Page 137: ...Chapter3 Installation...
Page 212: ...Chapter4 Calibration...
Page 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Page 284: ...Chapter5 Software...
Page 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Page 335: ...Chapter6 Troubleshooting...
Page 408: ...Chapter7 Replacement...
Page 418: ...Replacement 7 11 166...
Page 488: ...Chapter8 Periodic Maintenance...
Page 502: ...Periodic Maintenance 8 15...
Page 505: ...Chapter9 Technical Reference...
Page 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Page 526: ...11 Appendix System Schematics...