Replacement
7-29
1.
Lift up the side of the Workstation carefully and keep the
balance of the Workstation.
2.
Remove the screws of the side cover and remove the side
cover.
3.
Loose the nut and remove the Non-central control wheel.
4.
In position 2, move the Workstation and verify that the
Workstation can be moved smoothly.
7.3.7.
Monoblock With FDB Kit
During the Monoblock replacement procedure, at least 2 powerful men are required to
avoid C-arm unbalanced condition and injury.
After
Monoblock removal, the system will be in
unbalance status
. The back of C-arm will lower
than normal. Take care anything would be
pressured by C-arm. Find wood block to support the
mainframe is appreciated.
Paste the Rating Plate and Filtration Procedure
Paste the Rating plate and Filtration label in the Brivo OEC 715/785/865 label kit on the Monoblock as shown
below.
For China, paste the Chinese rating plate in the label kit.
For other countries, paste the multi-language rating plate as per local language
requirement, English rating plate is pasted as default.
CAUTION
Summary of Contents for Brivo OEC 715
Page 2: ......
Page 19: ...Chapter1 Introduction and Safety...
Page 41: ...Introduction and Safety 23 46 54 20 18 26...
Page 55: ...Chapter2 System Overview...
Page 137: ...Chapter3 Installation...
Page 212: ...Chapter4 Calibration...
Page 275: ...Brivo OEC 715 785 865 Mobile C Arm X Ray Product Service Manual 4 64...
Page 284: ...Chapter5 Software...
Page 326: ...Software 5 43 2 Click on install to continue 3 Click Next to continue...
Page 335: ...Chapter6 Troubleshooting...
Page 408: ...Chapter7 Replacement...
Page 418: ...Replacement 7 11 166...
Page 488: ...Chapter8 Periodic Maintenance...
Page 502: ...Periodic Maintenance 8 15...
Page 505: ...Chapter9 Technical Reference...
Page 521: ...Technical Reference 9 17 Vertical configuration 1 5m Vertical configuration 1m...
Page 526: ...11 Appendix System Schematics...