![background image](http://html1.mh-extra.com/html/fendt/favorit-900/favorit-900_workshop-manual_40018701137.webp)
Fav 700
Fav 900
Hydraulics / General system
Test report - fax template
E
Testing
Fav 900 chassis number 23/3001 and up
12/2000
9600
000001
E
a
1/2
Capitel
Docu-No.
Index
Date
Version
Page
Test report - fax template
Text-module
Text-module
Fendt
Test report / overall hydraulics
operation
Measurement no.
Chassis no.
Op. hrs.
reading
Keyword
Name
Date
Time
Starting condition
LS pump
pressure
LS pressure
Control
pressure
Auxiliary
pump
pressure
Other
results
- engine idling
(bar)
(bar)
(bar)
(bar)
- all valves in neutral
Measuring
point M3
Measuring
point M4
Measuring
point M5
Measuring
point M2
- no steering; suspension lok-
ked
on central
control
block ZSB
on central
control
block ZSB
on end plate
EP
on central
control
block ZSB
Oil tem-
pera-
ture
A
LS pump test
SETPOINT SETPOINT SETPOINT SETPOINT
ACTUAL
ACTUAL
ACTUAL
ACTUAL
AC-
TUAL
A1
Min. standby pressure (for star-
ting process see separate test)
42-45
22 +/-1
22 +/-1
Min
A2
Free steering when stationary
Depending on resistance
22 +/-1
Min
to left / right
A3
Steering to stop
200 / 200
200 / 200
22 +/-1
Min
to left / right
/
/
A4
Control valve 1
200 / 200
200 / 200
22 +/-1
Min
Lift / Lower
/
/
A5
Control valve 2
200 / 200
200 / 200
22 +/-1
Min
Lift / Lower
/
/
A6
Control valve 3
200 / 200
200 / 200
22 +/-1
Min
Lift / Lower
/
/
A7
Control valve 4
200 / 200
200 / 200
22 +/-1
Min
Lift / Lower
/
/
A8
Control valve 5
200 / 200
200 / 200
22 +/-1
Min
Lift / Lower
/
/
A9
Rear EPC with external
pushbutton to stop
200
200
22 +/-1
Min
A10
Front power lift with external
pushbutton to stop
200
200
22 +/-1
Min
A11
Suspension ON or during lifting
200
200
22 +/-1
Min