![background image](http://html1.mh-extra.com/html/fendt/favorit-900/favorit-900_workshop-manual_40018701007.webp)
Farmer 400
Fav 700
Fav 900
Electrics / system in general
B031 / B032 - draft-sensing pin right / left
E
Testing
900 >23/3001
16.2.2001
9000
000059
E
b
2/3
Capitel
Docu-No.
Index
Date
Version
Page
B031 / B032 - draft-sensing pin right / left
PM-Picturemodule
Text-module
Note:
Ignition ON
Text-module
Text-module
Text-module
PMTAB_Picture
When checking signal voltage, press bottom link
back with tyre lever.
Test
Pin
Target value
Condition
Possible cause of fault
Supply
3
9.5 +/- 7%
VDC
Supply and earth come
from
Earth
1
A005 (EPC box)
(in event of overload A005
switches off)
Signal
2
2.5 VDC
Tensile load
4.75 +/- 10%
VDC
Neutral
7.5 VDC
Compressive load
Earth
1
Measuring points on B031 (right draft-sensing pin)
Measuring points on A005 - EPC box
Pin
Earth
38
Signal
25
+ supply
40
Measuring points on B032 (left draft-sensing pin)
Measuring points on A005 - EPC box
Pin
Earth
38
Signal
43
+ supply
40