Fav 700
Fav 900
Hydraulics / Valve assemblies
Installation and removal of pilot valve
G
Repair
Fav 900 chassis number 23/3001 and up
25.07.2001
9620
000004
G
a
5/6
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of pilot valve
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Tighten cover of electrohydraulic actuator unit.
PMTAB_Picture
Insert control valve.
Note:
Chapter 9620 Reg. G - Installation and removal
of control valves SB 23 LS-EHS
PMTAB_Picture
Note:
Change microfilter - FF before fitting end plate
- EP.
Thoroughly clean filter housing and
control-pressure bores in end plate - EP.
Chapter 9620 Reg. A - End plate - EP
Chapter 9620 Reg. G - Installation and removal
of control pressure microfilter FF
PMTAB_Picture
Connect control valve connector.
X326 = Y015 (1st layer)
X327 = Y016 (2nd layer)
X328 = Y017 (3rd layer)
X329 = Y018 (4th layer)
X330 = Y019 (5th layer = enhanced control front
power lift)