Fav 900
Transmission / Live PTO
Installation and removal of live PTO clutch
G
Repair
27.08.2001
1220
000002
G
a
9/9
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of live PTO clutch
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Clean flange surfaces.
Check that two dowel pins (20) (arrowed) are
present.
Coat flange surface with surface
sealant X 903.050.074.
PMTAB_Picture
Insert existing adjusting washers (1) into upper
bore.
Note:
Determining required adjusting washer (1)
Chapter 1220 Reg. G - Installation and removal
of live PTO gearbox
Fit and grease four new O-rings for pressure
connections.
PMTAB_Picture
Attach housing cover to hoist, taking appropriate
safety precautions, and mount on rear-axle
housing.
PMTAB_Picture
Tighten M18 fastening nuts and bolts to 400 Nm .
Fit B020 - sensor, PTO 1 (connector X 169)
Fit B021 - sensor, PTO 2 (connector X170)
Clip electric cables in place.
Screw compressed-air connections to connecting
frame.
Mount trailer hitch.
Fill with transmission oil.
Note:
Chapter 0000 Reg. A - Fuels and lubricants