Fav 900
Transmission / Live PTO
Installation and removal of live PTO gearbox
G
Repair
28.08.2001
1220
000003
G
a
8/17
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of live PTO gearbox
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Clip circlip (112) in place on opposite side.
PMTAB_Picture
Slide inner race of taper roller bearing (123) onto
shaft (120).
Fit washer (122).
Clip circlip (121) in place.
Coat two setscrews (125) with synthetic bonding
agent X903.050.084 and screw in until inner race
of taper roller bearing (123) is in contact.
Washer (122) must be firmly held.
PMTAB_Picture
Slide needle-roller assembly (109), spacer (110)
and needle-roller assembly (109) onto shaft (120).
Insert shaft (120).
Fit washer (108).
Clip circlip (107) in place.
PMTAB_Picture
Insert new compact sealing rings (219) into
cylinder (217).
Insert new O-ring (218) into groove in cylinder
(217) and grease. Grease seal elements.
Insert piston (222) with compression spring (221)
into cylinder (217) in configuration shown.
Note:
Compact sealing ring (219) consists of two
parts, O-ring on outside and piston guide ring
on inside.