Fav 900
Engine / Injection Pump
Checking Start of Delivery VP 44
E
Testing
Fav 900 Chassis Number 23/3001 and up
01/2000
2710
000003
E
b
6/7
Capitel
Docu-No.
Index
Date
Version
Page
Checking Start of Delivery VP 44
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Important:
Bock injection pump. (Note sequence!)
- Loosen locking screw (Pos. A).
- Remove spacer washer (Pos. B).
- Tighten locking screw (Pos. A) .
PMTAB_Picture
Loosen TDP screw.
PMTAB_Picture
Turn cankshaft further until start of delivery , TDP
(+/- 0,5
°
) is reached.
Note:
If this position cannot be reached, the injection
pump drive pinion must be shifted by one
tooth.
Chapter 2700 Reg.G (Injection pump VP44 -
Replacement)
PMTAB_Picture
Tighten "TDP screw" at 25 Nm .