![background image](http://html1.mh-extra.com/html/fendt/favorit-900/favorit-900_workshop-manual_4001870425.webp)
Fav 900
Transmission /Front PTO
Installation and removal of front PTO gearbox
G
Repair
Fav 900 chassis number 23/3001 and up
20.08.2001
1200
000007
G
a
10/15
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of front PTO gearbox
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Slide inner race of taper roller bearing (4) onto
shaft (18).
PMTAB_Picture
Fit locating ring (2) and clip circlip (1) in place.
Oil bearing, knock bearing in both directions and
turn bearing.
PMTAB_Picture
Fit torque gauge X 899.980.151 and check
rotational resistance of shaft bearing.
Target value = 40-60 Ncm (0.4-0.6 Nm)
In event of discrepancies, correct using adjusting
washers (3) and check rotational resistance
again.
Note:
To measure rotational resistance, fit socket
head cap screw to shaft (18) and lock with
washer and nut.
PMTAB_Picture
Coat shaft seal (19) on outside with spirit/water
mixture (1:1 ratio).
Fill sealing lips 2/3 with grease.
Press uniformly deeply into gearbox housing with
sealing lip facing oil chamber.