![background image](http://html1.mh-extra.com/html/fendt/favorit-900/favorit-900_workshop-manual_4001870390.webp)
Fav 900
Transmission / Front PTO
Installation and removal of front PTO gearbox
G
Repair
Fav 900 chassis number 23/3001 and up
20.08.2001
1200
000006
G
a
5/11
Capitel
Docu-No.
Index
Date
Version
Page
Installation and removal of front PTO gearbox
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PM-Picturemodule
PMTAB_Picture
Remove pin lock.
PMTAB_Picture
Withdraw pin using tyre lever
and swing lift cylinder forwards.
PMTAB_Picture
Remove cover.
PMTAB_Picture
●
Brace PTO stub shaft.
●
Loosen socket head cap screw.
Note:
Socket head cap screw is secured with Loctite.
Note:
Chapter 1200 Reg. C - Technical drawing of
front PTO