![background image](http://html1.mh-extra.com/html/fendt/favorit-900/favorit-900_workshop-manual_4001870483.webp)
Farmer 400
Fav 700
Fav 900
Transmission / enhanced actuation system valves
Checking valve unit
E
Testing
711 / 712 > 21/1001 - 714 / 716 > 21/2001; 900 > 23/3001
24.11.2000
1600
000001
E
a
2/3
Capitel
Docu-No.
Index
Date
Version
Page
Checking valve unit
Single e-box
Checking high-pressure circuit in valve unit
Following preliminary work must be carried out:
Bullet-List
●
Remove right rear wheel and panels.
●
Remove drain plug at connection T .
●
Connect pressure gauge with range of greater than 500 bar to test connection PH .
PM-Picturemodule
Text-module
Test sequence:
1. Start engine.
2. Actuate Emergency mode.
Text-module
3. Pull on handbrake.
Danger:
Jack tractor up on 4 trestles taking appropriate safety precautions (high-pressure
measurement).
PMTAB_Picture
Actuate clutch pedal.
Actuate push-button to left of steering wheel.
Following is displayed on combi-instrument: