![ABB RELION Series Technical Manual Download Page 675](http://html1.mh-extra.com/html/abb/relion-series/relion-series_technical-manual_3663191675.webp)
CB2 control logic
GUID-58887722-274A-4EFE-B1AA-2EED602DB304 V1 EN
Figure 352:
Sub module diagram for CB2 control logic
Operation of the output signals is described in the table.
Table 675:
Operating conditions for output signals of CB2
Output signal
Operation description
Operation type
OPEN_CB2
If bus 2 is faulty and the CB2
position is closed,
OPEN_CB2
is
activated after "CB2 Trip delay"
has expired.
Protection
Setting
Main bus priority = “bus
1”.
If CB2 position is closed and bus
1 is healthy,
OPEN_CB2
is
activated after "Open CB2
delay" has expired.
Automatic reconnection
CLOSE_CB2
Setting
Main bus priority = “bus
2”.
If both CB1 and CB2 are open,
and bus 2 is healthy,
CLOSE_CB2
is activated after
Close CB2 delay has expired.
Operation is independent of the
state on bus 1.
Automatic reconnection
Setting
Main bus priority = “bus
1”.
If both CB1 and CB2 are open,
bus 1 is faulty and bus 2 is
healthy,
CLOSE_CB2
is
activated after
Close CB2 delay
has expired.
Automatic transfer
Activation of
BLOCK
input deactivates the outputs and resets the timers.
1MRS758755 A
Section 9
Control functions
REC615 and RER615
669
Technical Manual
Summary of Contents for RELION Series
Page 1: ... RELION PRODUCT FAMILY Grid Automation REC615 and RER615 Technical Manual ...
Page 2: ......
Page 30: ...24 ...
Page 50: ...44 ...
Page 189: ...3 18 5 Settings 1MRS758755 A Section 3 Basic functions REC615 and RER615 183 Technical Manual ...
Page 206: ...200 ...
Page 514: ...508 ...
Page 714: ...708 ...
Page 786: ...780 ...
Page 796: ...790 ...
Page 798: ...792 ...
Page 803: ...797 ...