permits the circuit breaker closing in a situation where the voltages are in opposite
phases. This can damage the electrical devices in the primary circuit. Therefore, it is
extremely important that the wiring from the voltage transformers to the terminals on
the rear of the protection relay is consistent regarding the energizing inputs
U_BUS
(bus voltage) and
U_LINE
(line voltage).
The wiring should be verified by checking the reading of the phase difference
measured between the
U_BUS
and
U_LINE
voltages. The phase difference measured
by the protection relay has to be close to zero within the permitted accuracy tolerances.
The measured phase differences are indicated in the LHMI. At the same time, it is
recommended to check the voltage difference and the frequency differences presented
in the monitored data view. These values should be within the permitted tolerances,
that is, close to zero.
shows an example where the synchrocheck is used for the circuit breaker
closing between a busbar and a line. The phase-to-phase voltages are measured from
the busbar and also one phase-to-phase voltage from the line is measured.
GUID-DE29AFFC-9769-459B-B52C-4C11DC37A583 V3 EN
Figure 324:
Connection of voltages for the protection relay and signals used in
synchrocheck
1MRS758755 A
Section 9
Control functions
REC615 and RER615
627
Technical Manual
Summary of Contents for RELION Series
Page 1: ... RELION PRODUCT FAMILY Grid Automation REC615 and RER615 Technical Manual ...
Page 2: ......
Page 30: ...24 ...
Page 50: ...44 ...
Page 189: ...3 18 5 Settings 1MRS758755 A Section 3 Basic functions REC615 and RER615 183 Technical Manual ...
Page 206: ...200 ...
Page 514: ...508 ...
Page 714: ...708 ...
Page 786: ...780 ...
Page 796: ...790 ...
Page 798: ...792 ...
Page 803: ...797 ...