![ABB RELION Series Technical Manual Download Page 566](http://html1.mh-extra.com/html/abb/relion-series/relion-series_technical-manual_3663191566.webp)
GUID-9947B4F2-CD26-4F85-BF57-EAF1593AAE1B V1 EN
Figure 294:
Complex power and power quadrants
Table 566:
Power quadrants
Quadrant
Current
P
Q
PF
Power
Q1
Lagging
+
+
0…+1.00
+ind
Q2
Lagging
-
+
0…-1.00
-cap
Q3
Leading
-
-
0…-1.00
-ind
Q4
Leading
+
-
0…+1.00
+cap
The active power P direction can be selected between forward and reverse with
Active
power Dir
and correspondingly the reactive power Q direction can be selected with
Reactive power Dir
. This affects also the accumulated energy directions.
The accumulated energy is calculated separately as forward active (
EA_FWD_ACM
),
reverse active (
EA_RV_ACM
), forward reactive (
ER_FWD_ACM
) and reverse reactive
(
ER_RV_ACM
). Depending on the value of the unit multiplier selected with
Energy
unit Mult
, the calculated power values are presented in units of kWh/kVArh or in units
of MWh/MVArh.
When the energy counter reaches its defined maximum value, the counter value is
reset and restarted from zero. Changing the value of the
Energy unit Mult
setting resets
the accumulated energy values to the initial values, that is,
EA_FWD_ACM
to
Forward
Wh Initial
,
EA_RV_ACM
to
Reverse Wh Initial
,
ER_FWD_ACM
to
Forward VArh
Initial
and
ER_RV_ACM
to
Reverse VArh Initial
. It is also possible to reset the
accumulated energy to initial values through a parameter or with the
RSTACM
input.
Section 8
1MRS758755 A
Measurement functions
560
REC615 and RER615
Technical Manual
Summary of Contents for RELION Series
Page 1: ... RELION PRODUCT FAMILY Grid Automation REC615 and RER615 Technical Manual ...
Page 2: ......
Page 30: ...24 ...
Page 50: ...44 ...
Page 189: ...3 18 5 Settings 1MRS758755 A Section 3 Basic functions REC615 and RER615 183 Technical Manual ...
Page 206: ...200 ...
Page 514: ...508 ...
Page 714: ...708 ...
Page 786: ...780 ...
Page 796: ...790 ...
Page 798: ...792 ...
Page 803: ...797 ...