3-22
Issue 1.0
March 2001
365-575-389
Installation Manual
Equipment Installation
Cabinet Installation (Continued)
Install EMC
Coverplates - OT
Cabinet Only
Introduction
EMC coverplates are required on both sides of the OT cabinet. The only exception
allowed is for the installation of end guards which is described later in this section.
End guards may be called out for appearance purposes when one side of the
cabinet is exposed at the end of a row or the cabinet is standing alone with both
sides exposed. Review installation instructions to determine which sides will have
end guards installed. Do not install EMC side shields and vertical cable channels
to these sides.
Procedure
Follow the steps outlined below to mount and assemble the EMC Coverplates on
the OT cabinet.
(Continued on next page)
Step
Action
1
Mount the Vertical Cable Channels to both sides of the cabinet frame
using the supplied M6 X 12 Hex Bolts with tooth lock washers. Starting
from inside the frame, insert the bolts with lock washers through
predrilled holes at the top and bottom of the frame. Align bolts with
threads on the Vertical Cable Channel, and secure the channel to the
frame using four bolts per channel as shown in Figure 3-2 on page 3-23.
2
Align the left panel to the left side of the cabinet with folded edges facing
inward towards the cabinet. Verify that the top center mounting screw
hole and coupling bolt holes are in alignment as shown in Figure 3-2
on page 3-23. A hole mismatch indicates that the right panel is being
aligned to the left side. Swap panels with the other side panel in the
installation kit and verify hole alignment.
3
Install left and right side panels using the eleven (11) Phillips head
screws (M5 X 0.8 X 6 mm) per side. Refer to Figure 3-2 on page 3-23.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...