
Issue 1.0
March 2001
4-17
365-575-389
Installation Manual
Power Cable Installation
Miscellaneously Mounted OT Shelves
(Continued)
List 10 OT Cable
Installation
The List 10 power cable connections at each shelf are to be installed prior to any
other intershelf wiring.
To install the intershelf power cable for the A supply perform the following:
(Continued on next page)
Step
Action
1
Locate the List 10 power cable for the A supply: ED-9C103-22, GR5/31 or
GR15/32. The supply end of the cable will have a RED jacket.
2
Take the connector farthest from the supply end and put it through the left
access hole of the System Shelf (lowest shelf). Align plug with PWR A
connector checking that the locking clip is on the right side and the RED
(–48V) is at the upper end of the connector. Push connector in until
locking tab snaps in place.
3
Select the connector of the remaining two that is farthest from the supply
end and put it through the left access hole of the Complementary Shelf 1
(middle shelf). Align plug with PWR A connector checking that the locking
clip is on the right side and the RED (–48V) is at the upper end of the
connector. Push connector in until locking tab snaps in place.
4
Take the remaining connector and put it through the left access hole of
the Complementary Shelf 2 (top shelf). Align plug with PWR A connector
checking that the locking clip is on the right side and the RED (–48V) is at
the upper end of the connector. Push connector in until locking tab snaps
in place.
5
Route excess cable into bay frame channel on left side and tie to frame.
6
Secure cable at entrance to frame.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...