Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
Table 5-37. Additional Cables Required for Five-Bay Rack and Stack
Follow the steps below to install the inter shelf cables for Bays 1-3.
(Continued on next page)
ED Cable Group
Connectors
7G028-22
803
J15
BUS IN
J5
IAO LAN
7G028-22
806
J7
CTL OUT
J6
CTL IN
7G028-22
812
J27
CTL OUT
J16-1
J8-1
J16-2
J8-2
RESET IN
EQPG OUT
RESET IN
EQPG OUT
Step
Action
1
Remove the ED7G028-20 Group 29 cable from the Bay 1 OLS shelf J27
and OT System Controller shelf J8 and J16 connectors.
2
Route the P27 end of the E-D7G028-22 Group 812 cable through the
right side of the OLS shelf of Bay 1 and attach to the J27 CTL OUT (B)
connector on the OLS interconnection panel from which the G29 cable
was removed in Step 1.
3
Route the P8-1/P16-1 ends of the same cable through the right side of
the OT System Controller Shelf (middle shelf of Bay 1) to the
interconnection panel.
4 Attach
P8-1 to the J8 EQPG OUT connector on the OT System Controller
Shelf in Bay 1 (middle shelf).
5 Attach
P16-1 to the J16 RESET IN connector on the OT System
Controller Shelf in Bay 1.
6
Route the P8-2 and P16-2 ends of the same cable through the left side of
the second OT System Controller shelf in Bay 2, to the interconnection
panel.
7 Attach
P8-2 to the J8 EQPG OUT connector on the OT System Controller
Shelf in Bay 2.
8 Attach
P16-2 to the J16 RESET IN connector on the OT System
Controller Shelf in Bay 2.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...