
3-44
Issue 1.0
March 2001
365-575-389
Installation Manual
Equipment Installation
Miscellaneous Mount Installation
(Continued)
Vertical Space
Requirements
When installing shelves in the bay frame, the following mounting requirements
must followed:
■
The heat baffle mounted to the bottom of each shelf must be installed with
each shelf. The heat baffles are not to be removed from any shelf.
■
The mounting bracket hole separation of 11 inches, as shown in
Figure 3-14 on page 3-42, must be maintained for the miscellaneous OT
shelves. The supplied interconnecting cables will not be long enough for a
larger separation.
■
Either another heat baffle or an open space of three (3) inches is required
for cooling at the top of each OLS or OT miscellaneously mounted shelf
installation. The shelves may be mounted at any height ranging from the
lower heat baffle touching the base of the bay, to any distance above the
base, as long as the top clearance of 3 inches or greater is maintained.
The total height required for the various OT List structures is as follows:
Adjustment of
Side Mounting
Brackets
The side mounting brackets of the OLS and OT shelves are factory installed for
mounting to the narrow mounting flange of a Lucent Technologies 800 Type bay
frame. These brackets are identified by the letters L and R stamped on them.
For mounting to the Lucent Technologies 801 Type frame using the wide mounting
flange, the bracket needs to be moved forward to another set of mounting holes.
For other bay frame types, the bracket should be positioned to provide the best
overall results or removed entirely and the shelf mounted using the front flanges.
(Continued on next page)
List Number
Vertical Space Required
List 10
66 Inches
List 11
24 Inches
LIst 12 with List 11
45 Inches
List 13 with List 11 and 12
66 Inches
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...