Issue 1.0
March 2001
9-29
365-575-389
Installation Manual
Local Installation Testing
OT Miscellaneous Discrete Tests
Background
NOTE:
This test does not apply to Release 3.0 and subsequent releases using
integrated OLS/OT systems.
The testing of the miscellaneous discrete contacts is performed as a combined
OT/OLS test using a fully tested OLS. The test verifies:
n
The operation of the miscellaneous discretes on each OTU circuit board
and at each OT slot connector
n
The wiring to the EMDU
n
The EMDU itself
n
The TBOS link to the WaveStar OLS 40G
n
The WaveStar OLS 40G software
n
To start testing of miscellaneous discretes the following steps must have
been completed:
n
The WaveStar OLS 40G must be installed and tested.
n
The WaveStar OLS 40G must be loaded with Release 2.0 or greater
software.
n
Wiring to the EMDU from the OT must be complete as described in
Appendix D for Dantel EMDU information, or Appendix E for Harris EMDU
information.
n
Wiring to the EMDU from the WaveStar OLS 40G and the –48 Volt supply
voltage must be complete as specified in Appendix D or E.
n
Switch and strap settings on the EMDU must be completed as described in
Appendix D or E. If switch setting must be changed, the DANTEL EMDU
must be powered down for the new settings to be activated.
n
The OLS and OT are not integrated as defined in OLS R3.0 and
subsequent releases.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...