Wired Cable Installation
CIT (CMC) DTE Cables Installation
Description
The WaveStar OLS 40G supplies access to remote CenterLink Management
Console (CMC) PCs through a local area network or modem connection to the
CIT-DTE port.
This connection to the Optical Translator System Shelf is not supported in any of
the WaveStar OLS 40G Releases; however, in Release 3, information may be
transferred from the OT to the OLS provided the OT Controller Option is installed.
Available CIT
(CMC) DTE
Cables
Table 5-13 lists cables available for CIT (CMC) DTE applications for WaveStar
OLS 40G.
Table 5-13. WaveStar OLS 40G CIT (CMC) DTE Cable
Table 5-18 lists cables available for CIT (CMC) DTE applications.
CIT (CMC) DTE
Cable Connections
to WaveStar OLS
40G
Interconnection
Panel
The CIT-DTE cable connects from J17 to a local area network or modem which
must meet the following requirements:
■
Must be able to transmit at 300, 1200, 2400, 4800, or 9600 baud.
■
Must have an RS-232 DCE interface port.
■
Must be configured for 8 bit data bytes with 1 start bit and 1 stop bit.
■
Must not use the DSR lead.
ED-7G028-22 Cable Group
Cable Length (ft.)
702
As Required (150’ max.)
752
150’
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...