Issue 1.0
March 2001
9-43
365-575-389
Installation Manual
Local Installation Testing
Final Testing of OTU Circuit Packs
(Continued)
Final Test
Procedures
(continued)
NOTE:
If a loopback is used to reduce the amount of test equipment needed while
testing 41F-type Gigabit Ethernet OTUs, remove the loopback before
removing the test signal. While the loopback is in place, if a loss of signal
condition is introduced by removing the test signal, a circuit pack failure
may be seen on the pack with the loopback in place. Restoring the signal
may not clear the failure and the circuit pack may require reseating. Upon
circuit pack recovery, enter the Configuration.Update.System command.
Miscellaneous
Discrete Power
Fail Test for Non-
Integrated OLS/
OT Systems
The miscellaneous discrete Circuit Pack Fail Alarm is required to turn ON for all
OTUs within a shelf when there is either an A or B supply failure. In addition, each
shelf will have two miscellaneous discrete Power Fail alarms, one for the A power
source and the other for the B power source.
(Continued on next page)
Step
Action
Reference
4
If the OTU/OTPM meets requirement, replace the
protective INPUT and OUTPUT caps. Do not install input
or output fibers.
5
Repeat steps two and three until all the OTU/OTPMs
have been tested.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...