Issue 1.0
March 2001
5-63
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
Cable installation for Bays 1-3 continues:
(Continued on next page)
Step
Action
9
Remove the ED-7G045-20 G2 Termination from J7 on the
interconnection panel of the top shelf, OT Complimentary 1 Shelf in Bay
1.
10
Remove the ED-7G045-20 G6 termination from the J15 connector of the
OLS shelf in Bay 1 and discard.
11
Route the P15 end of the ED-7G028-22 G803 cable through the right
side of the OLS shelf in Bay 1 and attach to the J15 BUS IN connector.
12
Route the P5 end of the same ED-7G028-22 G803 cable through the left
side of the OT System Controller Shelf of Bay 2 and connect to the J5
IAOLAN connector.
13
Remove the termination from the J7 connector of the OT System
Controller Shelf of Bay 2.
14
Route the P7 end of the ED-7G045-20 G6 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P7 to the J7 CTL
OUT connector.
15
Route the P6 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P6 to the J6 CTL IN
connector.
16
Route the P9 end of the ED-7G045-20 G7 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P9 to the J9 EQPG
IN 1 connector.
17
Route the P8 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P8 to the J8 EQPG OUT
connector.
18
Route the P13 end of ED-7G045-20 G9 cable through the left side of the
OT System Controller Shelf of Bay 2 and attach P13 to J13 RESET OUT
1 connector.
19
Route the P16 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P16 to the J16 RESET IN
connector.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...