3-14
Issue 1.0
March 2001
365-575-389
Installation Manual
Equipment Installation
Equipment Bay Frame Installation
(Continued)
Connecting the
Equipment Bay
Frame to Building
Ground
Introduction
The following section provides the procedures necessary to connect the frames to
building or office ground to:
■
provide a direct earth ground connection for lightning protection.
■
provide a common ground potential for electrostatic discharge (ESD)
protection.
Additional information
All WaveStar OLS 40G equipment bay frames are shipped with a ground cable
assembly. The ground cable should be connected between the bay frame ground
connection point and a suitable building ground connection point immediately
after the bay frame has been mounted to the floor.
Connecting the Bay Frame to Building Ground
Follow the steps listed below to connect the Bay Frame to building ground:
NOTE:
The building ground cable associated with raised floor installations may be
below the floor. It is permissible to attach a ground wire nearer the base of
the frame if the contact area has been cleaned down to bare metal.
Step
Action
1
If not already attached, connect the ground cable lug to the bay frame at
the unpainted area in the upper left front corner on the frame with two (2)
#12-24 x 1/4 screws. (See note below for installation on raised floors.)
2
Connect the 6-gauge stranded ground wire to the building ground cable
using a crimped Thomas & Betts 54720 C-tap lug. The recommended
crimping tool is a Thomas & Betts TBM5S with die code “brown.”
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...