10-34
Issue 1.0
March 2001
365-575-389
Installation Manual
Fiber Connections
Ring Closure Verification
Background
Line verification procedures check optical line continuity between WaveStar OLS
40G sites. This procedure assumes that the fiber has been connected at each
WaveStar OLS 40G site as detailed earlier in this chapter.
Line Verification
Procedure
Perform the steps in the following table to verify the fiber is properly connected
and the WaveStar OLS 40G sites are communicating with each other:
NOTE:
If at any step the requirements are not met, resolve the problem using
procedures in the 365-575-387 WaveStar OLS 40G User/Service Manual
before proceeding.
Step
Action
1
Log into any WaveStar OLS 40G site using the CMC PC.
2 Execute
CONFIGURATION.Retreive.Ring.Map.
Requirement: Verify the TIDs are all listed correctly. Verify the
communication status is good for each site.
3 Execute
FAULT.Retreive.Alarms.Network.
Requirement: Verify there are no alarms at the requested level.
4 Execute
FAULT.Retreive.Alarms.All.
Requirement: Verify there are no local alarms.
5 Execute
SECURITY.Retreive.System.
Requirement: Verify the APSD state is ENABLED. If it is not, use the
SECURITY.Enter.System command to ENABLE the APSD.
6
Log into another site using the correct TID.
Requirement: Verify the Alarm and Status Report displayed upon logging
in reports no alarms.
7
Execute SECURITY.Retreive.System at the remote site.
Requirement: Verify the APSD state is ENABLED. If it is not, use the
SECURITY.Enter.System command to ENABLE the APSD.
8
Repeat Steps 6 and 7 for all sites in the optical line system.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...