10-6
Issue 1.0
March 2001
365-575-389
Installation Manual
Fiber Connections
Overview (Continued)
Description of
Procedures
This section contains procedures to start at the WaveStar OLS 40G DS-NE
(assumed to be the 1A Transmit) office and connect sites sequentially to the
AGNE (assumed to be the 1A Receive) office. The following procedures are
included in this section:
n
DS-NE Office Transmit OA Connection Procedure
n
Repeater A Direction Connection Procedure
n
AGNE Office Receive OA Connection Procedure
n
AGNE Office Transmit OA Connection Procedure
n
Repeater B Direction Connection Procedure
n
DS-NE Office Receive OA Connection Procedure
Sequence of
Operations
Operations in this section start at the DS-NE site (1A Transmit) and proceed in the
A direction to the other end terminal (AGNE/1A Receive) as shown in Figure 10-1
on page 10-6.
Once the installation team reaches the AGNE site again they will proceed back in
the B direction to the DS-NE site.
Figure 10-1.
System Turnup Sequence of Example System
OLS AB3
Repeater
OLS AB4
1A Receive
OLS AB1
1A Transmit
OLS AB2
Repeater
4
3
5
2
6
1
DS-NE
AGNE
NOTE:
OLSAB1 to OLSAB4
are example TIDS
START
FINISH
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...