
Issue 1.0
March 2001
5-55
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
(Continued on next page)
Step
Action
9
Remove the ED-7G045-20 G2 Termination from J7 on the
interconnection panel of the top shelf, OT Complimentary 1 Shelf in Bay
1.
10
Remove the ED-7G045-20 G6 termination from the J15 connector on the
OLS shelf in Bay 1 and discard.
11
Route the P15 end of the ED-7G028-22 G803 cable through the right
side of the OLS shelf in Bay 1 and attach to the J15 BUS IN connector.
12
Route the P5 end of the same ED-7G028-22 G803 cable through the left
side of the OT System Controller Shelf of Bay 2 and connect to the J5
IAOLAN connector.
13
Remove the ED-7G045-20 G2 termination from J7 of the OT System
Controller Shelf of Bay 2.
14
Route the P7 end of the ED-7G045-20 G6 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P7 to the J7 CTL
OUT connector.
15
Route the P6 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P6 to the J6 CTL IN
connector.
16
Route the P9 end of the ED-7G045-20 G7 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P9 to the J9 EQPG
IN 1 connector.
17
Route the P8 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P8 to the J8 EQPG OUT
connector
18
Route the P13 end of ED7G045-20 G9 cable through the left side of the
OT System Controller Shelf of Bay 2 and attach P13 to J13 RESET OUT
1 connector.
19
Route the P16 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P16 to the J16 RESET IN
connector.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...