
5-44
Issue 1.0
March 2001
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
One OLS Shelf/
Two OT System
(continued)
(Continued on next page)
Step
Action
2
Route the J14 end of the ED-7G028-22 G801, 851, or 853 cable through
the left side of the OLS shelf and attach to the P14 BUS OUT connector.
Refer to Figure 5-1to locate the connector.
3
Route the P5/P6 ends of the same cable through the left side of the OT
System Controller #1 shelf to the interconnection panel.
4
Remove the ED-7G045-20 G2 termination from the J6 CTRL IN
connector of OT System Controller #1 shelf and attach P6.
5
Attach P5 to the J5 IAO LAN connector of OT System Controller #1 shelf.
Refer to Figure 5-3 to locate the connectors.
6
Route the P27 end of the ED-7G028-22 G812, 813, or 814 cable through
the right side of the OLS shelf and attach to the J27 CTL OUT (B)
connector on the OLS interconnection panel. Refer to Figure 5-1 to locate
the connector.
7 Route
the
P8-1/P16-1 ends of the same cable through the left side of the
first OT System Controller #1 shelf to the interconnection panel.
8 Attach
P8-1 to the J8 EQPG OUT connector on OT System Controller #1
shelf.
9 Attach
P16-1 to the J16 RESET IN connector of OT System Controller #1
shelf. Refer to Figure 5-3 to locate the connectors.
10 Route
the
P8-2/P16-2 ends of the same cable through the left side of the
second OT System Controller #2 shelf to the interconnection panel.
11 Attach
P8-2 to the J8 EQPG OUT connector of OT System Controller #2
shelf.
12 Attach
P16-2 to the J16 RESET IN connector of OT System Controller #2
shelf. Refer to Figure 5-3 to locate the connectors.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...