If the mounting bracket needs to be moved, follow the procedures in the table
below:
Mounting Shelves
to Bay Frame
Mount the shelf to the bay frame using three (3) mounting screws in each bracket
on each side. The Lucent Technologies 800 and 801 Type bay frames use a No.
12-24 x 3/4 inch long screw for mounting. If using a different bay frame, check
mounting hardware requirements for that particular frame. Verify a three (3) inch
or greater open space is available above the shelf.
(Continued on next page)
Step
Action
1
Remove the three (3) screws holding the bracket
2
Slide the bracket one inch forward towards the front of the shelf
3
Align the bracket holes with the new set of mounting holes on the chassis
side.
Result: The bracket should now be parallel with its previous position,
offset by one inch.
4
Install and tighten the mounting screws
5
Perform the same operation with the mounting bracket on the other side
of the shelf
6
Repeat the process for the brackets on any remaining shelves
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...