The procedure for testing this alarm operation is as follows:
Step
Action
Reference
1
Verify that all OTU/QOTU/OTPMs are seated in their
slots and are powered. All OTU/OTPMs should have
their faceplate LEDs flashing.
2
Verify by using the CMC command FAULT-RETRIEVE-
ALARM-ALL that the slots with OTU/OTPMs have only
Incoming Signal Fail (LOS) Alarm (alarms 49 through
72). Alarm numbers 17 through 48 (CP FAIL) are to be
OFF. Power Fail alarms, 81 through 86 are to Off.
3
Remove the A fuse from the System Shelf.
4
Verify using the CMC that the correct Power Fail Alarm
has turned ON. All other Power Fail alarms are to be
OFF.
Table 9-4 on
page 9-35
5
Verify that the circuit pack fail alarms (CP FAIL) turn ON
for all the OTU/QOTUs plugged into the System Shelf.
These circuit pack fail alarms will only appear on the
CMC terminal. The circuit pack faceplate LEDs will
remain flashing during this test.
6
Replace the A fuse and WAIT until the alarms clear on
the CMC.
7
Repeat the test for the B fuse on the System Shelf.
8
Repeat steps 3 and 7 for Complementary Shelves 1 and
2 if installed.
9
When completed, unplug OTU/QOTUs and leave in
slots.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...