5-40
Issue 1.0
March 2001
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
One OLS Shelf/
One OT System
(continued)
Table 5-23. One OLS Shelf to One OT System Interconnection Cables
(continued)
Interconnection Cable Installation Procedure
Perform the following steps to install the interconnecting cables (refer to
Figure 5-7).
(Continued on next page)
ED-7C028-22
Cable Group
Cable Length
(ft.)
Connections
OLS
OT
802
20
J27
CTL OUT B J8
J16
EQPG OUT
RESET IN
852
100
854
200
Step
Action
1
Remove the ED-7G028-20 G6 termination from P14 on the OLS
interconnection panel.
2
Route the J14 end of the ED-7G028-22 G801, 851, 853, or 855 cable
through the left side of the OLS shelf and attach to the P14 BUS OUT
connector. Refer to Figure 5-1 to locate the connector.
3
Route the P5/P6 ends of the same cable through the left side of the OT
System Controller shelf to the interconnection panel.
4
Remove the ED-7G045-20 G2 termination from the J6 CTRL IN
connector and attach P6.
5
Attach P5 to the J5 IAO LAN connector. Refer to Figure 5-3 to locate the
connectors.
6
Route the P27 end of the ED-7G028-22 G802, 852, or 854 cable through
the right side of the OLS shelf and attach to the J27 CTL OUT (B)
connector on the OLS interconnection panel. Refer to Figure 5-1 to locate
the connector.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...