15
Route the P5 end of the same ED-7G028-22 G803 cable through the left
side of the OT System Controller Shelf of Bay 2.
16
Attach P5 to the J5 IAO LAN connector on the OT System Controller
Shelf of Bay 2.
17
Remove the ED-7G045-20 G2 Termination from the OT System
Controller Shelf of Bay 2 and attach it to the J7 CTL OUT connector of the
OT Comp. 1 Shelf in Bay 2.
18
Route the P7 end of the ED-7G045-20 G6 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P7 to the J7 CTL
OUT connector.
19
Route the P6 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P6 to the J6 CTL IN
connector.
20
Route the P9 end of the ED-7G045-20 G7 cable through the left side of
the OT System Controller Shelf of Bay 2 and attach P9 to the J9 EQPG
IN 1 connector.
21
Route the P8 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P8 to the J8 EQPG OUT
connector.
22
Route the P13 end of ED-7G045-20 G9 cable through the left side of the
OT System Controller Shelf of Bay 2 and attach P13 to J13 RESET OUT
1 connector.
23
Route the P16 end of the same cable through the left side of the OT
Complimentary 1 shelf in Bay 2 and attach P16 to the J16 RESET IN
connector.
24
Tie excess cable into left or right bay frame channels.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...