4-24
Issue 1.0
March 2001
365-575-389
Installation Manual
Power Cable Installation
Rack and Stack Configurations
(Continued)
Power Cable
Connection
Follow the procedures below for installing and connecting the power cables to the
bays in a Rack and Stack configuration.
(Continued on next page)
Step
Action
1
Turn the power breakers off, or do not install fuses, at the battery
distribution fuse board (BDFB)
2
Verify the circuit packs are not installed in the shelves.
3
Identify the battery feed connections at the BDFB or other protection
equipment. They should be labeled BAT A, BAT A RTN, BAT B, and BAT
B RTN.
4
Discard any power cables supplied with the shelves, including the
harness mounted in the integrated bay.
5
Install the 12 AWG connectorized power feeders supplied as comcode
848633871 from A and B loads of the shelves to the fuse panel. For a
Two-Bay or Three-Bay System, the fuse panel in Bay 2 is used for all
shelves. For a Five-Bay System, use the fuse panel in Bay 2 for the
shelves in Bays 1 and 2 and for the upper OT Complimentary Shelf 2 in
Bay 3; use the fuse panel in Bay 4 for the shelves in Bays 4 and 5 and for
the lower OT Complimentary Shelf 2 in Bay 3. See Table 4-6 through
Table 4-7
6
Install the 12 AWG connectorized power feeders supplied as comcode
848633871 from A and B loads of the shelves to the fuse panel. For a
Two-Bay or Three-Bay System, the fuse panel in Bay 2 is used for all
shelves. For a Five-Bay System, use the fuse panel in Bay 2 for the
shelves in Bays 1 and 2 and for the upper OT Complimentary Shelf 2 in
Bay 3; use the fuse panel in Bay 4 for the shelves in Bays 4 and 5 and for
the lower OT Complimentary Shelf 2 in Bay 3. See Table 4-6 through
Table 4-7
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...