Powering
Powering & Testing Procedures
(Continued)
WaveStar OLS 40G
Check Battery
Return Cable
Connection
Follow the procedures listed below to check the Battery Return Cable Connection
for OLS only installations:
NOTE:
Since the power cable is tied together for both shelves if there are two OLS
shelves in the same equipment bay frame, the battery return measurement
only needs to be taken on the Lower Shelf.
NOTE:
For OT only installation, proceed to the OT Check Battery Return Cable
Connection Section.
(Continued on next page)
Step
Action
Reference
1
On the lower shelf (if there is more than one shelf in the
same bay), remove the two screws from the fuse panel
cover. Remove the cover. This will allow access to the
two Power Filters.
Power Filter A is on the top; Power Filter B is located
below it.
2
Remove the spade lug terminal from the bottom terminal
of the A (Top) Power Filter. The wire color is BLACK and
the end terminal is labeled -48VR. Using an Analog
Ohmmeter, measure the resistance from the wire end to
the unpainted cabinet frame ground.
NOTE:
Digital Multimeter may cause erroneous readings.
Requirement: The resistance shall measure less than
one (1) ohm.
3
After completing the measurement, restore connection
to the Power Filter
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...