Installation Manual
Local Installation Testing
ODU Tests (Continued)
ODU Test
Procedures
Use the following steps to preform the ODU test:
(Continued on next page)
Step
Action
Reference
1
To perform the following ODU tests, APSD must be
disabled to produce a valid OA signal. Disable APSD at
this time.
See Danger
notice on
previous
page.
2
Open the input to the test source amplifier as follows:
— For 1A-TX end terminals, verify the fiber is
removed from OA 1B IN to verify no signal is
driving the OA.
— For 1A-RCV end terminals, verify the fiber is
removed from OA 1A IN to verify no signal is
driving the OA.
— For a dual facing shelf, consider line 1 a 1A-RCV
configuration, and line 2 a 2A-TX configuration.
See
Figure 9-1
and
Figure 9-2
3
Connect the output of the source OA to the INPUT port
of the ODU for line 1.
4
Connect the optical power meter to OCHAN1 OUT of the
ODU. Note the power meter reading.
Requirement: The power meter should show a power
level greater than –36 dB.
5
Move the optical power meter to the next OCHAN_ OUT
and measure the power level.
Requirement: The power meter should show a power
level greater than –36 dB and within approximately
10 dB of OCHAN 1 OUT. The power level should
increase slightly through the middle wavelengths and
taper back to the original value from OCHAN 1 at the
higher wavelengths.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...