
5-20
Issue 1.0
March 2001
365-575-389
Installation Manual
Wired Cable Installation
Serial, Parallel, and X.25 Telemetry
Cable Installation (Continued)
X.25 (TL-1)
Telemetry Cable
Installation
(continued)
Refer to Figure 5-1 for the location on the WaveStar OLS 40G interconnection
panel.
WaveStar OLS 40G
Parallel Telemetry
Cable Installation
Parallel telemetry reports a minimum set of alarms and status indications to a
maintenance center via a telemetry system.
Available Parallel Telemetry Cables
Table 5-2 lists the cables that are available for use in connecting Parallel
Telemetry.
Table 5-11.
WaveStar OLS 40G Parallel Telemetry Cables.
(Continued on next page)
Step
Action
1
Mark the blank label at the socket (female) end of the cable with the
appropriate jack number for the X.25 port on the operation support
system.
2
Making sure the plug end labeled (P18) of the cable is at the OLS
equipment, route the X.25 cable out the right side of the OLS shelf to the
X.25 port of the operation support system. See Figure 5-1.
3
Connect the X.25 telemetry cable to J18 on the interconnection panel.
4
Connect the X.25 telemetry cable to the X.25 port of the operation
support system.
5
Dress and tie the cables.
ED-7G028-22
Cable Group
Cable Length
(ft.)
301
As Required
351
150
361
250
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...