Issue 1.0
March 2001
5-61
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
Each of the OT Complimentary Shelf 2 (List 13) installed as the top shelf in Bay 2
or Bay 4 will be supplied with the following cables, however they may not be pre
installed:
Table 5-35. Cables supplied with OT Comp. 2 Shelf (List 13), Bay 2 or Bay 4
Each of the OT Complimentary Shelf 2 (List 13) installed as the top or bottom
shelves in Bay 3 will be supplied with the following cables:
Table 5-36. Cables supplied with OT Comp. 2 Shelf (List 13), Bay 3
NOTE:
The varying group number suffixes indicate different lengths of the cable,
which may change depending on the physical mounting location of the
shelf. No suffix indicates a seven foot cable (7’), an “A” suffix indicates a 9’
(nine foot) cable and the “B” suffix indicates an 11’6” cable (eleven foot, six
inches).
Two each of three additional cables are required for the Five-Bay Rack and Stack
configuration, and are listed in Table 5-32.
(Continued on next page)
ED Cable Group
Connectors
7G045-20
6
J7
CTL OUT
J6
CTL IN
7G045-20
8
J10
EQPG IN 2
J8
EQPG OUT
7G045-20
10
J14
RESET
OUT 2
J16
RESET IN
ED
Cable Group
(see note)
Connectors
7G045-20
11/11A/11B
J7
CTL OUT
J6
CTL IN
7G045-20
8/8A/8B
J10
EQPG IN 2
J8
EQPG OUT
7G045-20
10/10A/10B
J14
RESET
OUT 2
J16
RESET IN
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...