Issue 1.0
March 2001
4-19
365-575-389
Installation Manual
Power Cable Installation
Miscellaneously Mounted OT Shelves
(Continued)
List 11, 12, and 13
OT Cable
Installation
The power cable connections at each shelf are to be installed prior to any
intershelf wiring. The List 11, 12, and 13 shelves use the same A and B power
cables which have a single power connector at each end. It is assumed that the
shelves are being installed as single shelves. Each shelf will require a separate
power cable.
To install the intershelf power cable for the A and B supplies, perform the
following:
(Continued on next page)
Step
Action
1
Locate the A supply power cable for List 11, 12, and 13. It is the same
cable for all three list numbers: ED-9C103-22, GR7 (length = 15 ft.) or
GR8 (length as specified). The supply end of the cable will have a RED
jacket.
2
Put the connector through the left access hole of the shelf to be wired.
Align the plug with PWR A connector on interconnection panel checking
that the locking clip is on the right side and the RED (–48V) wire is at the
upper end of the connector. Push connector in until locking tab snaps in
place.
3
Route excess cable into bay frame channel on right side and tie to frame.
4
Secure cable at entrance to top of frame.
5
Locate the B supply power cable for List 11, 12, and 13. It is the same
cable for all three list numbers: ED-9C103-22, GR8 (length = 15 ft.) or
GR10 (length as specified). The supply end of the cable will have a BLUE
jacket.
6
Put the connector through the right access hole of the shelf to be wired.
Align the plug with PWR B connector on interconnection panel checking
that the locking clip is on the left side and the BLUE (–48V) wire is at the
lower end of the connector. Push connector in until locking tab snaps in
place.
7
Route excess cable into bay frame channel on right side and tie to frame.
8
Secure cable at entrance to top of frame.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...