Final Test
Procedures
Perform the following steps to final test the OTU/OTPMs:
(Continued on next page)
Step
Action
Reference
1
Obtain an appropriate signal from the associated
SONET/SDH transmission equipment or a SONET/SDH
test set. Verify with an optical power meter that the
source is within the input specification of the OTU/OTPM
(–27 to –11 dBm).
2
Connect the signal to the input of the first OTU/OTPM to
be checked. Connect an optical power meter to the
OTU/OTPM output using a fiber jumper with appropriate
connectors.
Requirement: The output power from the OTU/OTPM
Code shall be between the minimum and maximum
power specified in Table 9-6 on page 9-42 and the fault
LED shall be OFF.
Table 9-6 on
page 9-42
3
If the 506B OMU is being used, the incoming channels
must be balanced. Connect the output signal of the
OTU/OTPM which still has the test set on it from Step 2
to the correct OCHAN IN port of the OMU. Connect an
optical power meter or optical multi-wavelength meter to
the OMU OUT port.
Requirement: The per-channel output power of the
OMU should be -21 dBm.
If the Requirement is not met, adjust the LC LBO on the
OCHAN IN port of the OMU.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...