5-66
Issue 1.0
March 2001
365-575-389
Installation Manual
Wired Cable Installation
OLS/OT Integration Cables
Installation (Continued)
Rack and Stack
Configurations
(continued)
Cable installation for Bays 3-5 continues:
(Continued on next page)
Step
Action
2
Route the P27 end of the ED7G028-22 Group 812 cable through the right
side of the OLS shelf of Bay 5 and attach to the J27 CTL OUT (B)
connector on the OLS interconnection panel from which the G29 cable
was removed in Step 1.
3
Route the P8-1/P16-1 ends of the same cable through the right side of
the OT System Controller Shelf (middle shelf of Bay 5) to the
interconnection panel.
4 Attach
P8-1 to the J8 EQPG OUT connector on the OT System Controller
Shelf in Bay 5 (middle shelf).
5 Attach
P16-1 to the J16 RESET IN connector on the OT System
Controller Shelf in Bay 5.
6
Route the P8-2 and P16-2 ends of the same cable through the left side of
the second OT System Controller shelf in Bay 4, to the interconnection
panel.
7 Attach
P8-2 to the J8 EQPG OUT connector on the OT System Controller
Shelf in Bay 4.
8 Attach
P16-2 to the J16 RESET IN connector on the OT System
Controller Shelf in Bay 4.
9
Remove the ED-7G045-20 G2 Termination from J7 on the
interconnection panel of the top shelf, OT Complimentary 1 Shelf in Bay
5.
10
Remove the ED-7G045-20 G6 termination from the J15 connector of the
OLS shelf in Bay 5.
11
Route the P15 end of the ED7G028-22 G803 cable through the right side
of the OLS shelf in Bay 5 and attach to the J15 BUS IN connector.
12
Route the P5 end of the same ED7G028-22 G803 cable through the left
side of the OT System Controller Shelf of Bay 4.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...