![Lucent Technologies WaveStar OLS 40G Скачать руководство пользователя страница 191](http://html1.mh-extra.com/html/lucent-technologies/wavestar-ols-40g/wavestar-ols-40g_installation-manual_1946330191.webp)
Issue 1.0
March 2001
5-35
365-575-389
Installation Manual
Wired Cable Installation
OT Miscellaneous Mount Intershelf
Wiring (Continued)
Description
(continued)
Install List 12 intershelf cables as follows:
Table 5-21. Shelf Interconnecting Cables for List 12
(Continued on next page)
Step
Action
1
Remove the ED-7G045-20 GR2 termination from the System Controller
Shelf Connector J7 and plug it into Complementary Shelf 1 Connector J7.
2
Install intershelf cables as specified in Table 5-21. Refer to Figure 5-5.
3
Route cables out the left or right side access holes as specified in
Table 5-21. When all the cables have been installed, tie excess cable into
left or right bay frame channels.
4
Upon completion of Table 5-21 interconnections, verify that
ED-7G045-20, GR2 termination connectors are on System Shelf J6 and
Complementary Shelf 1 J7. If missing, install replacement terminations.
These are required for proper system performance.
5
Using the (J69000C-1, List 161) shelf label kit, apply the identification
labels to OT Bay 1 per the following:
■
LOW to System Controller Shelf
■
MID to Complementary Shelf 1
6
If the system has an OT Bay 2, apply labels in same location as listed for
OT Bay 1 using the (J69000C-1, List 161) shelf label kit.
Cable Part No.
Side to
Run Cable
From
Shelf/Jack
To
Shelf/Jack
Connector
Pin Size
ED-7G045-20, GR6
Left
System Shelf/
P7 to J7
Compl. Shelf 1/
P6 to J6
15
ED-7G045-20, GR7
Left
System Shelf/
P9 to J9
Compl. Shelf 1/
P8 to J8
15
ED-7G045-20, GR9
Right
System Shelf/
P13 to J13
Compl. Shelf 1/
P16 to J16
25
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...