2-12
Issue 1.0
March 2001
365-575-389
Installation Manual
System Installation Planning
WaveStar OLS 40G Basics (Continued)
Release 7
Architecture
Release 7 offers optical add-drop multiplexer (OADM) capabilities. Two
components of OADM are add-drop flexibility and flexible amplification. Add-drop
flexibility enables the add-drop of one or more channels without requiring the
through traffic pay the penalty of regeneration. In this case, an OADM node would
allow through, or express, traffic to pass through the node from ODU to OMU
without passing through an OTU for regeneration. See Figure 2-12. To avoid jitter,
all traffic must be regenerated in the fourth OADM node. For instance, in a ring
with 6 nodes, all traffic would require regeneration once. In a ring with 4 OADM
nodes and a number of repeaters, the traffic would not require signal regeneration
with OTUs. The nodes shown in Figure 2-12. can be either dual end terminals or
dual facing shelves. The engineering rules for through traffic can be found in the
Applications, Planning, and Ordering Guide (365-575-384).
Figure 2-12. Network Diagram with Wavelength Add/Drop and Through
Channels
(Continued on next page)
OT
U
s
OT
U
s
OT
U
s
E
n
d
Te
rm
in
a
l
E
n
d
Te
rm
in
al
W
es
t
Ea
st
OTUs
OTUs
OTUs
End Terminal
End Terminal
East
West
OT
U
s
OT
U
s
OT
U
s
E
n
d
Te
rm
in
al
E
n
d
Te
rm
in
a
l
We
st
Ea
st
OTUs
OTUs
OTUs
End Terminal
End Terminal
West
East
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...