Installation Manual
Wired Cable Installation
OT Miscellaneously Mount Intershelf
Wiring
Description
Intershelf wiring is required for list 10, 12, and 13. The List 11 System Controller
Shelf does not require intershelf wiring since it is the initial stand-alone shelf.
■
List 10 — Includes the System Controller Shelf with Complementary
Shelves 1 and 2. Power cables and shelf interconnecting cables are
provided.
■
List 11 — Includes the System Controller Shelf and single shelf power
cables.
■
List 12 — Includes Complementary Shelf 1, single shelf power cables, and
interconnecting cables to the System Controller Shelf. It is provided to
handle system growth beyond a single System Controller shelf. It is
assumed that the system already has a System Controller Shelf installed.
■
List 13 — Includes Complementary Shelf 2, a set of single shelf power
cables, and interconnecting cables to the System Controller Shelf and
Complementary Shelf 1. It is provided to handle system growth beyond a
System Controller shelf and Complementary Shelf 1. It is assumed that the
system already has a System Controller Shelf and Complementary Shelf 1
installed.
If any of the shelf interconnections have not yet be made, complete these before
proceeding.
NOTE:
When installing cables, match cable plug designation with jack designation
such that a P7 cable designation is connected to a J7 connector
designation.
The jack designations for Complementary Shelf 1 and 2 are shown in Figure 5-2.
Figure 5-3 shows the jack designations for the System Shelf interconnection
panel.
NOTE:
Do not intermix ED-7G045-20 G6 and ED-7G045-20 G11 cables, which
both have P6 and P7 labels on the connector boots. The cables are wired
differently and are not interchangeable. Refer to the shelf interconnecting
tables for proper connection locations.
(Continued on next page)
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...