
2-4
Issue 1.0
March 2001
365-575-389
Installation Manual
System Installation Planning
WaveStar OLS 40G Basics (Continued)
Bidirectional
Optical Line
(continued)
To achieve full equipment diversity 4-fiber systems would use two optical lines,
one for service and one for protection (Figure 2-3).
Figure 2-3.
Connection to Both One and Two Lines
Basic WaveStar
OLS 40G Shelf
The basic WaveStar OLS 40G shelf holds one or two optical lines identified as
Line 1 and Line 2. If only one line is needed, then either line can be equipped first
(i.e., line 2 can be used before line 1). Refer to Figure 2-4 and Figure 2-5.
Figure 2-4.
End Terminal Shelves (1A-TX at Left/1A-RCV at Right)
(Continued on next page)
E
λ
3
2-Fiber
To/From
Central Office 1
End
Line 1
Line 2
OC-48
λ
5
λ
5
Other
Nodes
4-Fiber
OC-48
Service
Protect
Terminal
E
λ
3 W
2-Fiber
To/From
Central Office 2
End
Line 1
Line 2
OC-48
λ
5
λ
5
Other
Nodes
4-Fiber
OC-48
Service
Protect
Terminal
W
Line
1
Line
2
Line
1
Line
2
Line 1
Line 2
S
Y
S
M
E
M
S
Y
S
C
T
L
T
O
H
C
T
L
OA
ODU
ODU OM
OM
TLM
TLM
OA
OA
OA
1A
1B
2A
2B
1A
2A
1A
2A
1B
2B
Line
1
Line
2
Line
1
Line
2
Line 1
Line 2
S
Y
S
M
E
M
S
Y
S
C
T
L
T
O
H
C
T
L
OA
ODU
ODU
OM
OM
TLM
TLM
OA
OA
OA
1A
1B
2A
2B
1A
2A
1A
2A
1B
2B
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...