Issue 1.0
March 2001
3-11
365-575-389
Installation Manual
Equipment Installation
Equipment Bay Frame Installation
(Continued)
Uncrating and
Moving the
Equipment Bay
(continued)
Moving the Bay - Supplementary Information
The bottom shipping detail should be removed if a transport dolly is to be attached
to the base of the bay. Removal can take place after the bay has been hoisted to
the upright position.
The top shipping detail should remain in place until the bay is in its final floor
location. It may be temporarily removed for entry or door clearance, but should be
replaced prior to additional movement.
Procedures for
Moving the Bay
Below are listed the steps for moving the equipment bay to the specified location:
Step
Action
1
Plan out the moving procedure before starting to move the equipment.
Two or more installers should be used for this operation.
2
Move the equipment bay to the designated location.
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...