![Lucent Technologies WaveStar OLS 40G Скачать руководство пользователя страница 165](http://html1.mh-extra.com/html/lucent-technologies/wavestar-ols-40g/wavestar-ols-40g_installation-manual_1946330165.webp)
Issue 1.0
March 2001
5-9
365-575-389
Installation Manual
Wired Cable Installation
Interconnection Panel Description
(Continued)
OT
Interconnection
Panel (continued)
■
EQUIP OUT J8: This connector provides an interface to the System
Controller Shelf for equipage information.
■
RESET IN J16: This connector provides an interface to the System
Controller Shelf for reset information.
■
PWR A and B: These connectors provide an interface to the -48V DC
power coming from source A and source B. They are installed at the
factory.
The Interconnection Panel for the System Shelf is shown as Figure 5-3 on page
5-9.
Figure 5-3.
Interconnection Panel for OT System Shelf
The System Shelf external interface connections operational for WaveStar OLS
40G Release 3.0 are as follows:
■
CP FAIL J2: This connector provides an interface to the Circuit Pack
Failure Miscellaneous Discrete relay contacts located on each OTU within
the shelf.
■
INC SIG FAIL
J3: This connector provides an interface to the Incoming
Loss of Signal Miscellaneous Discrete relay contacts located on each OTU
within the shelf.
■
IAO LAN J5: This connector provides an interface for a 10-Mb/s intraoffice
local area network (LAN) to the OLS End Terminal Shelf.
■
CTL IN J6: This connector provides shelf-to-shelf local area network
connections.
■
CTL OUT J7: This connector provides shelf-to-shelf local area network
connections.
■
EQUIP OUT J8: This connector provides an interface to the System
Controller Shelf for equipage information.
(Continued on next page)
PWR A
RTN A
J1 CIT DTE
J3 INC SIG FAIL
J2 CP FAIL
O
F
F
A
L
M
S
J
4
I
A
O
L
A
N
J
5
C
T
L
I
N
J
6
C
T
L
O
U
T
J
7
E
Q
P
G
I
N
1
J
9
E
Q
P
G
I
N
2
J
10
J12 X.25
J11 USER PNL
J14 RESET OUT 2
J13 RESET OUT 1
E
Q
P
G
O
U
8
T
J
RTN B
PWR B
J16 RESET IN
DCE
CIT
J15
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...