
3-8
Issue 1.0
March 2001
365-575-389
Installation Manual
Equipment Installation
Equipment Bay Frame Installation
(Continued)
Marking and
Drilling Mounting
Holes (continued)
Procedures
Listed below are the steps for marking the floor and drilling the holes in concrete
floors:
Uncrating and
Moving the
Equipment Bay
Introduction
Covered in this section will be cautions and procedures necessary for uncrating
the bays and moving them to the specified location.
Cautions
Do NOT store containers in any position other than marked position.
Do NOT stack equipment more than two bays high.
(Continued on next page)
Step
Action
1
Obtain or create a template to match the four mounting holes in the base
of the bay frame
2
Mark the location of the mounting holes on the floor using the template
3
Drill four holes in the floor at the locations marked for the anchors
!
CAUTION:
Always wear safety glasses when drilling holes in concrete.
4
Insert the drop-in anchors or heavy duty anchors as specified by job
requirements
5
Follow the anchor manufacturer’s assembly and setting instructions
6
Remove all debris from the mounting area
7
Determine if floor mounting area is level and if shims may be needed.
!
Содержание WaveStar OLS 40G
Страница 4: ......
Страница 12: ...Contents xii Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 24: ...Tables xxiv Issue 1 0 March 2001 365 575 389 Installation Manual...
Страница 54: ...1 22 Issue 1 0 March 2001 365 575 389 Installation Manual Overall Installation and Test Considerations...
Страница 126: ...3 50 Issue 1 0 March 2001 365 575 389 Installation Manual Equipment Installation...
Страница 156: ...4 30 Issue 1 0 March 2001 365 575 389 Installation Manual Power Cable Installation...
Страница 228: ...5 72 Issue 1 0 March 2001 365 575 389 Installation Manual Wired Cable Installation...
Страница 366: ...7 16 Issue 1 0 March 2001 365 575 389 Installation Manual Powering...
Страница 390: ...8 24 Issue 1 0 March 2001 365 575 389 Installation Manual Network Element Startup and Provisioning...
Страница 436: ...9 46 Issue 1 0 March 2001 365 575 389 Installation Manual Local Installation Testing...
Страница 487: ...Issue 1 0 March 2001 12 15 12 Troubleshooting 12 Contents Background 2 Troubleshooting Table 3...
Страница 500: ...12 28 Issue 1 0 March 2001 365 575 389 Installation Manual Troubleshooting...
Страница 501: ...Issue 1 0 March 2001 A 1 A Releases 1 0 and2 0LBO Selection Tables A Contents Overview 2...
Страница 557: ...Issue 1 0 March 2001 F 1 F PC Setup Usage For CenterLink ManagementConsole F Contents Overview 2...
Страница 571: ...Issue 1 0 March 2001 H 1 H Optical Protection Switch OPS H Contents Overview 2...