![Schweitzer Engineering Laboratories SEL-421-4 Instruction Manual Download Page 463](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_1216726463.webp)
6.127
Date Code 20171021
Instruction Manual
SEL-421 Relay
Protection Applications Examples
Out-of-Step Logic Application Examples
Out-of-Step Unblocking During Three-Phase Faults
The trajectories of a three-phase fault and a power swing appear the same to
phase-distance elements because both a three-phase fault and a power swing con-
sist of positive-sequence quantities only (V
1
and I
1
). Therefore, if a power swing
evolves into an internal three-phase fault, typical OSB logic cannot detect the
occurrence of the balanced fault. The SEL-421 includes an additional set of inner
blinders to provide proper detection of the internal three-phase fault (see
). If the positive-sequence impedance resides between these blinders
for a specific duration, OSB logic unblocks. The relay calculates this duration
(UBOSBD) each time the power swing enters Zone 7. A short timer setting is
adequate for fast swings, but the relay needs a longer timer setting for slow power
swings. For example, if the positive-sequence impedance passes gradually
between the two inner blinders during a slow swing, a short timer setting would
cause unwanted tripping.
The UBOSBD timer length is the expected duration of the power swing within
the inner blinders. The relay bases the calculation on the actual time required for
the swing to traverse from Zone 7 to Zone 6, before entering the inner blinders. If
the swing remains inside the inner blinders for a period greater than UBOSBD,
an unblock signal asserts.
Figure 6.32
Inner Blinders
S
R
B
A
Zone 2
R1
X1
Zone 6
Zone 7
Right
Blinder
Left
Blinder
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...