5.159
Date Code 20171021
Instruction Manual
SEL-421 Relay
Protection Functions
Synchronism Check
noticeable voltage angle difference across the system (it is not simply zero
degrees). The corresponding angular separation results from load flow and the
impedance of the parallel system.
You must consider this angle difference when setting the synchronism-check ele-
ment for a paralleled system. For example, if the expected angle because of load
flow is 10 degrees, do not set the voltage angle difference setting to less than
15–20 degrees nominal. A paralleled system does not imply a zero degree voltage
angle difference at every measuring point.
Single-Phase Voltage Inputs
shows single-phase voltage transformers (1 PT) on Bus 1 and
Bus 2. Use these single-phase voltage sources to perform a synchronism check
across the two circuit breakers.
Synchronism check occurs on a single-phase voltage basis—see the single-phase
potential transformers (1 PT) shown on each bus in
. The assump-
tion is that if the monitored single-phase voltage inputs are in phase (within a set-
table voltage angle difference), and they meet the criteria of being healthy (within
a settable voltage magnitude window) and/or the voltage difference is less than a
set limit, the other phase-to-neutral voltages are likewise in phase and share the
same voltage magnitude relationship. The line voltage source is three-phase, but
you only need a single-phase bus voltage to perform a synchronism check across
the corresponding circuit breaker. The relay uses the three-phase voltage from the
line for other functions such as distance protection and metering.
Setting E25BK
n
:= Y
If E25BK
n
is set to Y, where
n
= 1 or 2, the synchronizing logic verifies that both
the reference voltage and synchronizing voltage are healthy (within a settable
voltage magnitude window) before enabling the synchronism-check logic.
Setting E25BK
n
:= Y1
If E25BK
n
is set to Y1, where
n
= 1 or 2, the synchronizing logic verifies that the
difference voltage between the reference and synchronizing voltages is less than
the 25VDIF setting before enabling the synchronism-check logic.
Figure 5.119
Synchronism-Check Voltages for Two Circuit Breakers
Bus 2
Bus 1
Line
BK2
BK1
1
3
1
. . .
. . .
. . .
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...