![Schweitzer Engineering Laboratories SEL-421-4 Instruction Manual Download Page 112](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_1216726112.webp)
3.8
SEL-421 Relay
Instruction Manual
Date Code 20171021
Testing
Checking Relay Operation
Checking Relay Operation
The SEL-421 comes to you with all functions fully checked and calibrated so that
the relay operates correctly and accurately. You can perform tests on the relay to
verify proper relay operation, but you do not need to test every relay element,
timer, and function in this evaluation. The following checks are valuable for con-
firming proper SEL-421 connections and operation:
➤
AC connection check (metering)
➤
Commissioning tests
➤
Functional tests
➤
Element verification
An ac connection check uses relay metering to verify that the relay current and
voltage inputs are the proper magnitude and phase rotation (see
Metering Quantities on page 3.35 in the SEL-400 Series Relays Instruction Man-
ual
).
Commissioning tests help you verify that you have properly connected the relay
to the power system and all auxiliary equipment. These tests confirm proper con-
nection of control inputs and control outputs as well (see
Inputs and Outputs on page 3.61 in the SEL-400 Series Relays Instruction Man-
ual
).
Figure 3.6
Test Connections Using a Single Current Source for a Phase-to-
Phase Fault
Three-Phase
Voltage and Current
Test Sources
IA
VB
IB
VC
IC
VA
IAW
Z01
Z02
Z03
Z04
Z05
Z06
Z13
Z14
Z15
Z16
Z17
Z18
IBW
ICW
VAY
VBY
VCY
Relay Rear-Panel Secondary
Voltage and Current Inputs
N
N
N
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...