![Schweitzer Engineering Laboratories SEL-421-4 Instruction Manual Download Page 385](http://html.mh-extra.com/html/schweitzer-engineering-laboratories/sel-421-4/sel-421-4_instruction-manual_1216726385.webp)
6.49
Date Code 20171021
Instruction Manual
SEL-421 Relay
Protection Applications Examples
500 kV Parallel Transmission Lines With Mutual Coupling Example
Relay Configuration (Group)
E21P
Mho Phase Distance Zones (N, 1–5)
3
E21MG
Mho Ground Distance Zones (N, 1–5)
3
E21XG
Quadrilateral Ground Distance Zones (N, 1–5)
3
ECVT
Cvt Transient Detection (Y, N)
N
ESERCMP
Series-Compensated Line Logic (Y, N)
N
ECDTD
Distance Element Common Time Delay (Y, N)
Y
ESOTF
Switch-Onto-Fault (Y, N)
Y
EOOS
Out-Of-Step (Y, Y1, N)
N
ELOAD
Load Encroachment (Y, N)
N
E50P
Phase Inst./Def.-Time O/C Elements (N, 1–4)
1
E50G
Residual Ground Inst./Def.-Time O/C Elements
(N, 1–4)
N
E50Q
Negative-Sequence Inst./Def.-Time O/C Elements
(N, 1–4)
N
E51S
Selectable Inverse-Time O/C Elements (N, 1–3)
1
E32
Directional Control (Y, AUTO, AUTO2)
AUTO2
ECOMM
Communications-Assisted Tripping (N, DCB, POTT,
POTT2, POTT3, DCUB2, DCUB2)
POTT2
EBFL1
Breaker 1 Failure Logic (N, 1, 2, Y1, Y2)
N
EBFL2
Breaker 2 Failure Logic (N, 1, 2, Y1, Y2)
N
E25BK1
Synchronism Check for Breaker 1 (Y, N, Y1, Y2)
N
E25BK2
Synchronism Check for Breaker 2 (Y, N, Y1, Y2)
N
E79
Reclosing (Y, Y1, N)
N
EMANCL
Manual Closing (Y, N)
N
ELOP
Loss-of-Potential (Y, Y1, N)
Y1
EDEM
Demand Metering (N, THM, ROL)
N
EADVS
Advanced Settings (Y, N)
Y
VMEMC
Memory Voltage Control (SEL
OGIC
equation)
0
EFID
Enable FID Logic (Y, N)
Y
Z50P1
Zone 1 Phase Fault Detector (0.50–170.00 A,
secondary)
0.5
Z50G1
Zone 1 Ground Fault Detector (0.50–100.00 A,
secondary)
0.5
Mho Phase-Distance Element Reach (Group)
Z1MP
Zone 1 Reach (OFF, 0.05–64
secondary)
3.18
Z2MP
Zone 2 Reach (OFF, 0.05–64
secondary)
4.78
Z3MP
Zone 3 Reach (OFF, 0.05–64
secondary)
4.78
Mho Phase-Distance Element Time Delay (Group)
Z1PD
Zone 1 Time Delay (OFF, 0.000–16000 cycles)
OFF
Z2PD
Zone 2 Time Delay (OFF, 0.000–16000 cycles)
OFF
Z3PD
Zone 3 Time Delay (OFF, 0.000–16000 cycles)
OFF
Table 6.13
Settings for 500 kV Parallel TX Example (Sheet 3 of 7)
Setting
Prompt
Entry
Summary of Contents for SEL-421-4
Page 6: ...This page intentionally left blank ...
Page 14: ...This page intentionally left blank ...
Page 30: ...This page intentionally left blank ...
Page 104: ...This page intentionally left blank ...
Page 128: ...This page intentionally left blank ...
Page 536: ...This page intentionally left blank ...
Page 584: ...This page intentionally left blank ...
Page 616: ...This page intentionally left blank ...
Page 696: ...This page intentionally left blank ...
Page 750: ...This page intentionally left blank ...
Page 755: ...Instruction Manual PM400 01 NB SEL 400 Series Relays Instruction Manual 20171006 ...
Page 776: ...This page intentionally left blank ...
Page 932: ...This page intentionally left blank ...
Page 976: ...This page intentionally left blank ...
Page 1024: ...This page intentionally left blank ...
Page 1038: ...This page intentionally left blank ...
Page 1064: ...This page intentionally left blank ...
Page 1128: ...This page intentionally left blank ...
Page 1206: ...This page intentionally left blank ...
Page 1316: ...This page intentionally left blank ...
Page 1350: ...This page intentionally left blank ...
Page 1464: ...This page intentionally left blank ...
Page 1468: ...This page intentionally left blank ...
Page 1492: ...This page intentionally left blank ...
Page 1518: ...This page intentionally left blank ...